Sizing
Clarification tank
Mill capacity, Cm1 : 40
MT/ hr
Diluted crude oil to FFB, n : 65 %
Diluted Crude oil, TCO = Cm1
x n
= 40 x 0.65
= 26 MT/ hr
Retention time, RT : 6 hours
Safety factor, k : 1.2
Capacity of clarification tank = TCO x RT x k
= 26 x 6 x 1.2
= 187.2 MT
~ 190 MT
Assume
Empty
space, A : 1 ft (0.33m)
Oil
Layer B : 1 ft (0.33m)
Sludge
Layer C : distance
of oil droplets travel
Oil particle
size & % : 90 % > 60 micron
: 10 % < 60 micron
According to Stork’s Law
Velocity of
rise, v : 125
micron/ sec
Retention
time, RT : 6 hrs
Distance of
travel, c = v x RT
= 125 x 6 x 3600
= 2700
mm
Total length of clarifier feed pipe = A
+ B + C
= (0.33) + (0.33) + (2.7)
= 3.36
m
Height of clarifier tank, H = 2 x 3.36
= 6.8 m
Diameter of clarifier D =
= 6.2 m